Friday 4 March 2011

Evaluation - 05/03/11

Today we did more filming for our production. Although we previously thought we had enough footage to last the two minutes of the opening sequence, when edited it turned out that we only had about one minute 30 seconds. To overcome this problem, we went out and filmed some more shots to add length to the sequence. We took shots that would set the scene for our crime thriller, so for example we took shots of industrial and rough looking areas, and we also took a lot of shots of different signs with illegal things on, and the penalty for the crime if it was committed.

We have also did more editing on the footage that has already been filmed, this was to improve the quality and overall appeal of the opening scene. We have added in some transitions and effects, this along with cutting of clips we have managed to improve the continuity of the clips we filmed.

We think that this lesson and all the lessons up to this have been well organized and executed. This is because we have managed to gain enough footage and have edited the footage so that it is acceptable and exceeds the level of standards that we set our selves. In previous lessons we have also done a lot of filming that included more acting and character footage, this footage was then cut down when we edited it which is why we filmed more today. The filming today was focused on setting the scene.

Things that we haven't yet done are; Making the text which will be placed over certain shots in different ways to display the title and the names of characters/editors and producing the film.

No comments:

Post a Comment